Classification and current-state boundary

This is one conditional Security Best Practices Insight about the optional Junior maintenance fee. The release parameters at frozen commit a82d4fefb02768e5b3bddcc97dee371eee24fea8 list juniorMaintenanceFeeAprBps = 0, disabled at deployment. SECURITY.md likewise says the release deploys at 0 bps, and the retained v2.0.0 Arbitrum Sepolia observation measured 0 bps. Pending maintenance-fee shares are therefore zero in that reviewed state. The programme also says this test deployment's configuration is not the production configuration.

I am not reporting a current Critical, High, Medium, or Low vulnerability, selecting a vulnerability impact, or claiming that current production funds are at risk. The programme says: "Issues reachable only through feature gates, flags, configurations or networks that are not active on the listed deployment are out of scope." Its out-of-scope list also contains "Best practice recommendations, except when submitted as Insights under the Insight Reporting section." Its Insight rule says runnable code is not required and the PoC must explain when the Insight is valuable. Immunefi defines a Security Best Practices Insight as an improvement that strengthens security design or implementation against potential threats even without an immediate or known vulnerability. The programme states both provisions separately and does not specify which controls this conditional preventive Insight. This report is submitted under the Security Best Practices Insight route and does not claim that the inactive configuration is a vulnerability or select any vulnerability impact.

Missing joint supply invariant

At the frozen source commit, JuniorMaintenanceFeeMathLib.pendingFeeShares() computes:

uint256 retainedRay = retentionRay(aprBps, chargeableHours);
if (rawSupply == 0 || retainedRay == RAY) {
    return 0;
}

return Math.mulDiv(rawSupply, RAY - retainedRay, retainedRay, Math.Rounding.Floor);

In the retained 100 bps state that pending amount fits in uint256. TrancheVault.accruedTotalSupply() then performs a separate checked addition:

rawAndPendingSupply = totalSupply();
if (!IS_SENIOR) {
    rawAndPendingSupply += pendingMaintenanceFeeShares();
}

No lifecycle check enforces the joint domain:

rawSupply + pendingFeeShares(rawSupply, rate, elapsedHours)
    + fixed downstream headroom <= type(uint256).max

The domain depends jointly on rate, elapsed fee hours, and raw supply. It matters to ordinary lifecycle paths whenever a nonzero fee is active: Junior mint and burn paths checkpoint the fee before changing supply, the checkpoint mints fee shares through super._update, configuration finalization checkpoints an old nonzero rate before installing the staged rate, share-pricing paths add VIRTUAL_SHARES = 1000, and HousePool reads accrued Junior supply during whole-Pool settlement.

The retained demonstration activated the allowed rate first and then grew raw supply while the fee was active. Source analysis also shows the reverse order is unsafe: if a future activation starts from raw supply outside the proposed rate/horizon domain, ordinary checkpointing, supply changes, Pool settlement, and the owner-only zero-rate finalizer can reach the same raw-plus-pending overflow condition.

Exact recommendation

The owner-only rate change remains a trusted action and is not the finding. The recommendation is to derive one exact joint-domain bound and enforce it in the ordinary downstream supply and settlement consumers for every accepted state:

  1. Derive the exact maximum raw supply from the configured rate and maximum supported catch-up horizon, reserving all fixed downstream headroom, including VIRTUAL_SHARES; use that shared bound in items 2 through 5.
  2. After any due fee checkpoint and before every ordinary Junior supply increase, use a subtraction-first check such as sharesToMint <= maxSafeRaw - totalSupply(); do not first evaluate totalSupply() + sharesToMint.
  3. Apply the same invariant to the checkpoint's own fee mint. Specify a bounded policy for excess accrued fees rather than allowing the checkpoint itself to revert.
  4. During whole-Pool settlement, reject or defer an unsafe Junior deposit epoch through a non-reverting path instead of allowing that epoch to veto unrelated settlement.
  5. Provide a documented zero-rate recovery that can exit the unsafe domain without first materializing an unrepresentable old-rate checkpoint, explicitly specifying whether exceptional accrued fee is capped or waived.
  6. Add invariant/property coverage across Pool losses, asynchronous deposits, rate/hour boundaries, cross-tranche settlement, and zero-rate recovery.

An exact construction for the bound and its rounding, overflow-free whenever retainedRay is at least 10^24 (a retained fraction of 0.001), is supplied in the PoC field.

Preconditions, overlap, and limitations

  • A trusted Pool owner must legitimately activate a nonzero fee through the documented proposal, 72-hour delay, and owner-only finalization lifecycle. A staged zero rate is subject to the same delay. No compromised role, malicious configuration, or bypass is claimed.
  • The retained conditional demonstration uses ordinary protocol entrypoints after activation and modeled contract-accepted Pyth values and timestamps. It does not show that an ordinary user controls Pyth or that the modeled sequence is likely live.
  • The retained raw state was deliberately constructed and is approximately 0.99997099 * 2^256; it is not presented as a likely live supply.
  • The evidence does not establish a current Arbitrum One deployment, current Pool population, or current funds exposed through this condition.
  • The specifications already cap one fee checkpoint at 8,760 charged hours, forgive older backlog, and keep elapsed hours pending after a reverted settlement. None of these bounds the joint domain: at 100 bps the retained state is unsafe at hour 26, inside the cap, and a persistent revert keeps the hours pending.
  • PR #72 (merged) added the fee formula, the vault integration, the specification text and the library test test_MaxReachableSupplyCanAddTheFullYearFeeWithoutOverflow, which checks one rate and full-year point and does not reserve the 1000-share pricing headroom. PR #127 (merged) raised the nominal APR cap from 1,000 to 10,000 bps and kept the max-uint-supply quote test at 1,000 bps. Those tests exercise the fee library at one point each; they do not enforce the joint domain across lifecycle transitions. The specifications describe the formula and deliberately require old-rate-first finalization. The known zero-share maintenance-fee limitation and Cecuro LOW-27 concern the opposite small-supply rounding condition, not this near-maximum raw-plus-pending overflow and recovery domain.
  • The programme invalidates a report whose root cause was publicly disclosed in listed repositories before submission. Public items were last reviewed through 2026-11-04; private and concurrent submissions cannot be checked from public sources.
  • The programme rewards only the best report of a given Insight; duplicate Insight submissions are invalid and not rewarded. No acceptance or reward is predicted.

The recommendation is valuable if the dormant setting may change, because it defines the invariant ordinary paths must preserve whenever the fee is active. It does not describe a deployment whose Junior fee is already nonzero and makes no current vulnerability claim.

Proof of Concept

Proof of Concept

Conditions under which this Insight is valuable

This preventive recommendation is valuable if Plether may ever enable a nonzero Junior maintenance fee. Its value requires:

  1. a trusted Pool owner legitimately activates a nonzero rate through the documented proposal, 72-hour delay, and owner-only finalization lifecycle;
  2. accepted Pool/Vault transitions, including ordinary deposit settlement, raise raw Junior share supply above the rate-and-time-specific safe bound while positive Junior principal remains;
  3. any necessary external-market condition occurs; the retained demonstration uses modeled Pyth values and does not claim ordinary-user control or live likelihood;
  4. enough complete fee hours elapse for the effective supply to exceed the supported domain; and
  5. an ordinary path reads or checkpoints Junior effective supply, changes Junior supply, or settles the Pool.

Condition 1 is false in the reviewed release and retained deployment state: both are 0 bps. This report therefore claims no current vulnerability, severity, selected vulnerability impact, or funds at risk.

Deterministic arithmetic and exact guard

For fixed retainedRay, the implementation computes:

pending = floor(raw * (RAY - retainedRay) / retainedRay)
effective = raw + pending = floor(raw * RAY / retainedRay)

If downstream pricing adds fixed headroom H, define:

L = type(uint256).max - H

The exact largest jointly safe raw supply is:

maxSafeRaw = floor(((L + 1) * retainedRay - 1) / RAY)

For TrancheVault pricing, H = VIRTUAL_SHARES = 1000. An implementation can avoid the wide intermediate by computing:

uint256 limit = type(uint256).max - VIRTUAL_SHARES;
uint256 q = Math.mulDiv(limit, retainedRay, RAY, Math.Rounding.Floor);
uint256 maxSafeRaw = q;
if (q != type(uint256).max
    && Math.mulDiv(q + 1, RAY, retainedRay, Math.Rounding.Floor) <= limit) {
    maxSafeRaw = q + 1;
}

After any due checkpoint, admit a supply increase only with subtraction-first arithmetic, with maxSafeRaw computed from the retention for the configured rate over the maximum supported catch-up horizon (8760 complete hours):

if (totalSupply() > maxSafeRaw || sharesToMint > maxSafeRaw - totalSupply()) {
    // reject or defer this epoch without reverting whole-Pool settlement
}

At 100 bps and 26 complete hours, the exact-integer values are:

retainedRay:
999970320058220522902660768

maxSafeRaw with 1000-share pricing headroom:
115788652534849107862278920397747535067303554773259679316828397679206758662857

effective(maxSafeRaw):
115792089237316195423570985008687907853269984665640564039457584007913129638935

effective(maxSafeRaw + 1):
115792089237316195423570985008687907853269984665640564039457584007913129638936

effective(maxSafeRaw) equals type(uint256).max - 1000; the upper neighbour is unsafe. For retained fractions below one half, pendingFeeShares can revert inside Math.mulDiv before the later addition. Proving that the pending amount alone fits is insufficient.

Retained conditional evidence

The retained local-fork run started from the measured zero-fee v2.0.0 Arbitrum Sepolia state at block 323664360, verified all 30 listed deployment runtime hashes, and replaced external Pyth/ArbSys dependencies only inside loopback Anvil. It legitimately activated an allowed 100 bps rate, then used public protocol entrypoints and a deliberately constructed modeled market path. The resulting raw supply was about 0.99997099 * 2^256; this demonstrates reachability of the arithmetic domain, not live likelihood.

At the first unsafe complete fee hour, hour 26, the run recorded the raw supply, pending fee shares, and remaining margin below; the last value is the raw supply minus the maxSafeRaw above:

raw Junior supply:
115788730297860575040627627497612678923408193484103067030503761236470677184077

pending fee shares:
3436704775157717622590734455871726693446532516736282470989810730797138471

remaining uint256 margin (type(uint256).max minus raw Junior supply):
3358939455620382943357511075228929861791181537497008953822771442452455858

raw supply above pricing-safe bound:
77763011467178348707099865143856104638710843387713675363557263918521220

Here the pending fee shares exceed that margin, so raw plus pending exceeds type(uint256).max. In that conditional state:

  • Junior accrued-supply reads and whole-Pool settlement revert with a Panic(uint256) selector 0x4e487b71; the retained output records the selector, not the encoded panic code;
  • a distinct positive Senior redemption remains pending and unfunded;
  • its cancellation reverts with TrancheVault__RedeemCancellationUnavailable() under the ordinary rule that a matured, funded, or refundable request cannot be cancelled; the Pool-only funding/refund paths cannot complete because settlement reverts; and
  • finalizing a staged zero rate checkpoints the old rate and reverts. The 72-hour delay ended 46.3 hours after the first unsafe hour, leaving the 100 bps rate and staged proposal in place.

Formula controls on the same raw supply remain safe at 100 bps after one complete hour and 25 bps after 72 hours. The deployed Junior vault also read accrued supply successfully at 100 bps after 25 complete hours. This isolates the joint rate/time/raw-supply domain rather than treating a large raw supply alone as the issue. A standalone compiled guard control rejected the 26-hour state; it was not a patched Vault. No patched-target run is claimed or required for this Insight.

Source and applicability boundary

The load-bearing source is the frozen competition tree, principally:

  • packages/perps/src/libraries/JuniorMaintenanceFeeMathLib.sol for retained-fraction and pending-share arithmetic;
  • packages/perps/src/TrancheVault.sol for checkpointing, effective-supply addition, fixed pricing headroom, supply mutation, and old-rate-first finalization; and
  • packages/perps/src/HousePool.sol for whole-Pool consumption and deposit settlement.

The v2.0.0 release was built from commit 1209ca8a5b94a4fb6323c7c4585846ed93db3932; the programme states that the in-scope packages/perps/src is identical at the frozen commit, and these three files are byte-identical at both commits.

The programme's Insight route does not require runnable code; it requires this field to state when the recommendation is valuable. The measurements above come from retained local-fork evidence and were not regenerated for this report. Public items were last reviewed through 2026-11-04; private and concurrent submissions cannot be checked from public sources.